New RFP: Appalachian Power Releases 3 RFPs up to 1GW

New RFP Announced

Highlights

Appalachian Power released three RFPs seeking wind and solar and co-located standalone battery energy storage and hydro resources.

1. Wind, Solar, and Battery energy storage – Purchase:

  • Seeking 800 MW
  • Minimium size:
    • Wind and Solar: 50 MW
    • BESS: 10 MW
  • Interconnected in PJM or APCo distribution system.
  • Commercial Operating Date before December 15th, 2029.
  • Proposals due July 15, 2025

2. Wind, Solar, and Hydro – PPA:

  • Seeking 300 MW
  • Minimium size:
    • Wind: 50 MW
    • Hydro: 10 MW
    • Solar: 5 MW
  • Interconnected in PJM or APCo distribution system.
  • Commercial Operating Date before December 31st, 2029.
  • Proposals due July 15, 2025

3. Renewable Energy Certificates (RECs):

  • Contract terms between 5-30 years.
  • Beginning January 1st, 2028.
  • Proposals due July 15, 2025

Learn more at: https://www.appalachianpower.com/business/b2b/energy-rfps/2025-RFPs

Subscribe To Our Newsletter.

Get updates and learn about energy procurement and RFP management best practices.

More To Explore

Discover Utility RFPs
Getting started

Discover Utility RFPs

Discover active utility RFPs from utilities across the U.S. for energy, IT, Services, and T&D in one searchable platform.

Energy Storage RFPs Find and Track Active Storage Opportunities
Getting started

Energy Storage RFPs: Find and Track Active Storage Opportunities

You can find energy storage RFPs in one searchable place on Energy Adepto. The main types include Battery Energy Storage System (BESS), paired solar + storage, all-source, long-duration, Distributed Energy Resources (DER), and pumped hydro RFPs.

Ready to optimize your energy RFP process?

Talk to an expert.

pylon, cables, sunrise-503935.jpg